Factory management and control starting and organizing a new factory - control of production and costs
Material type:
- 621.9 M149(21)
Item type | Current library | Call number | Status | Date due | Barcode | Item holds | |
---|---|---|---|---|---|---|---|
Books | ISI Library, Kolkata | 621.9 M149(21) (Browse shelf(Opens below)) | Available | 50434 |
Total holds: 0
Browsing ISI Library, Kolkata shelves Close shelf browser (Hides shelf browser)
No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
621.9 M149(19) Fine grinding and lapping | 621.9 M149(2) Air chucks and fixtures | 621.9 M149(20) Negative-rake milling | 621.9 M149(21) Factory management and control | 621.9 M149(22) Junior draughtman's text book | 621.9 M149(23) Powder metallurgy in practice | 621.9 M149(24) Press die design and construction |
There are no comments on this title.
Log in to your account to post a comment.